🛒 30,000+ Products
🚚 Delivering Australia Wide
🔥 Special Offers on Selected Makita Products - Shop Now!
🛒 30,000+ Products
🚚 Delivering Australia Wide
🔥 Special Offers on Selected Makita Products - Shop Now!
🛒 30,000+ Products
🚚 Delivering Australia Wide
🔥 Special Offers on Selected Makita Products - Shop Now!
🛒 30,000+ Products
🚚 Delivering Australia Wide
🔥 Special Offers on Selected Makita Products - Shop Now!
🛒 30,000+ Products
🚚 Delivering Australia Wide
🔥 Special Offers on Selected Makita Products - Shop Now!
🛒 30,000+ Products
🚚 Delivering Australia Wide
🔥 Special Offers on Selected Makita Products - Shop Now!
🛒 30,000+ Products
🚚 Delivering Australia Wide
🔥 Special Offers on Selected Makita Products - Shop Now!
🛒 30,000+ Products
🚚 Delivering Australia Wide
🔥 Special Offers on Selected Makita Products - Shop Now!
- All categories
- All categories
Welcome to A Class Building Materials
Main menu
-
Products
- Products
-
Fencing
-
Gates
-
Post
-
Screening
-
Cement & Concrete Mixes
-
Decking
-
Landscaping
-
Sleepers
-
Structural Timber
-
Building Materials
-
Tools
-
Paint & Decorating
-
Safety & Workwear
-
Automotive
-
Door & Hardware
-
Fasteners & Fixings
-
Cleaning
-
Latest Offers
-
Locations
-
Calculator
Your cart
Choose your Location
-
Head Office Ravenhall
27 Palm Springs Road, Ravenhall Victoria, Australia
-
Geelong
1 Industry Place Corio VIC 3214
Subheading
Product comparison
Describe you product comparison grid
|
__ __ |
|
|---|---|
| Description |
Description - __ |
| Rating |
Rating - __ |
| Vendor |
Vendor - __ |
| Color |
Color - __ |
|
|
Compare products ( / )
Structural Timber LVL Timber
LVL Structural Timber
Laminated veneer lumber for beams, lintels and joists — straighter and more consistent than sawn timber under load.
422 products
422 products
Sort by:
- Featured
- Most relevant
- Best selling
- Alphabetically, A-Z
- Alphabetically, Z-A
- Price, low to high
- Price, high to low
- Date, old to new
- Date, new to old
$48.17
This 2.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 120 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$54.19
This 2.7 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 120 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$60.21
This 3.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 120 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$72.25
This 3.6 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 120 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$84.29
This 4.2 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 120 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$96.34
This 4.8 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 120 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$108.38
This 5.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 120 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$120.42
This 6.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 120 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$52.17
This 2.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$58.70
This 2.7 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$65.22
This 3.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$78.27
This 3.6 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$91.31
This 4.2 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$104.36
This 4.8 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$117.39
This 5.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$130.44
This 6.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$72.07
This 2.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$81.08
This 2.7 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$90.09
This 3.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$108.11
This 3.6 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$126.13
This 4.2 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$144.14
This 4.8 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$162.16
This 5.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$180.18
This 6.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 130 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$56.23
This 2.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 140 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$63.26
This 2.7 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 140 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$70.29
This 3.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 140 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$84.35
This 3.6 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 140 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$98.41
This 4.2 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 140 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$112.46
This 4.8 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 140 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$126.52
This 5.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 140 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$140.58
This 6.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 140 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$60.24
This 2.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$67.77
This 2.7 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$75.30
This 3.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$90.37
This 3.6 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$105.42
This 4.2 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$120.48
This 4.8 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$135.54
This 5.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$150.60
This 6.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 42 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$83.20
This 2.4 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$93.61
This 2.7 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$104.01
This 3.0 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
$124.82
This 3.6 m length is a Tilling Timber SmartFrame SmartLVL 15 beam, 150 mm deep by 58 mm thick. Kiln-dried spruce veneers are laminated to AS/NZS 4357 and sold in fixed sections and lengths.
Cutting
- Do not resaw through the thickness.
- Depth rips must match a published smaller size.
Treatment
H3 LOSP treatment to AS/NZS 1604.4 suits above-ground framing with periodic wetting, against moderate decay, borers and termites. Keep it out of the ground and away from fascias, pergolas and faces that trap water. Coat every cut, notch and hole. The factory sealer sheds rain during storage and construction, when framed members may see weather for a limited time, usually not more than 3 months, and it does not totally waterproof the LVL.
Installation
- Joists, bearers, lintels, rafters, hanging beams, counter beams, strutting beams and underpurlins are sized from the SmartLVL 15 tables or an engineer.
- Design span runs to the centre of the required bearing, not across a thick wall.
- Restrain hanging, counter and strutting beams with blocking, a top tie or a galvanised strap.
- Do not skew-nail a rafter to an underpurlin parallel to the veneers, or birdsmouth that way.
- Inside AS 1684.2, one diagram allows one hole in any 1800 mm of span and the other allows three; otherwise ask an engineer.
- Use hot-dipped galvanised or stainless fasteners on exposed work, and a rated hanger for heavier joints.
- Wait seven days before painting, and prime faces and cuts.
Storage
- Store packs flat and off the ground, on bearers at most four metres apart, under a breathable cover.
- Wet LVL loses strength in the short term while wet, and some thickness swelling may not fully recover after drying.
Documents
Showing 44/422
Related Blogs
LVL Timber
LVL Timber in Melbourne – Beams & Framing
LVL timber (laminated veneer lumber) is an engineered product made from thin veneers bonded together, giving straight, consistent beams that span further than solid timber of the same size. Builders and carpenters in Melbourne use LVL for lintels, bearers, floor joists, rafters and ridge beams where strength and stability matter.
Choosing the right LVL
- Span tables: size LVL from the manufacturer's span tables or your engineer's plans, not by eye.
- Depth and thickness: deeper sections carry longer spans; thicker or doubled members suit heavier loads.
- Treatment: standard LVL is for protected, inside-the-envelope use; use H2 or H3 treated LVL where the product specification requires it.
- Orientation: LVL is designed to be loaded on its edge, so install it as specified.
- Fixings: use joist hangers and connectors rated for structural framing.
See also Framing Timber, Structural Timber and Joist Hangers.
FAQs
Can LVL be used outdoors?
Untreated LVL should stay protected from the weather. If it will be exposed, check the treated product's rating and seal it as recommended.
Can you cut LVL to length?
Tell us the lengths you need when ordering and we can advise on available stock lengths and cutting.
Do you deliver LVL across Melbourne?
Yes. We deliver long lengths across Melbourne and Victoria, or you can collect from our Ravenhall yard.
Let’s keep in touch!
Be the first to hear about the latest A Class Building Materials
Need help
Got questions? Call us
Need help with your order?
Available via chat
Chat With US
Shop by Category
Timber Fencing Colorbond Fencing Cement & Concrete Building Material Brush Fencing Landscaping Sleepers Decking Tools View All CategoriesQuick Links
Scam Alert Brochures Catalogues Shop All About us Careers Stores FAQs Trade / Credit Account All Brands- Choosing a selection results in a full page refresh.
- Opens in a new window.

